Positive news - and needs to be prioritised

Uimhir Thagarta Uathúil: 
KCC-C373-1
Stádas: 
Submitted
Údar: 
Shane O'Brien
Líon na ndoiciméad faoi cheangal: 
0
Teorainneacha Gafa ar an léarscáil: 
Níl
Údar: 
Shane O'Brien

Litir Chumhdaigh

I live near the Grand Canal, and use the existing sections of the Greenway on a regular basis.

The potential for the Grand Canal Greenway is enormous, and the remaining uncompleted sections should be prioritised for completion ASAP.

The Grand Canal Greenway will be a key link from Dublin (a large population & a key tourist hub) to the Barrow Blueway, the River Shannon and other sustainable travel routes, and to other tourist locations.

Tuairimí

Should be prioritised

As above, this project should be prioritised and the bridges built as soon as possible.
This is also a good opportunity to implement the required infrastructure for a greenway:

  • Seating
  • Signage
  • Information about the local area
  • Maps
  • Bins
  • Water taps
  • etc.
Priority
Infrastructure
Important
Network
Sustainable travel
Príomh-thuairim: 

This project should be prioritised and the bridges built as soon as possible.

Príomh-iarratais: 

Construction of bridges will provide a good opportunity to install Greenway infrastucture at the same time

Main reasons: 

Grand Canal Greenway has taken a long time to get this far, and priority is needed to complete these last remaining sections.

Faisnéis

Uimhir Thagarta Uathúil: 
KCC-C373-1
Stádas: 
Submitted
Líon na ndoiciméad faoi cheangal: 
0
Teorainneacha Gafa ar an léarscáil: 
Níl

Plé
Fiafraigh / freagra a thabhairt ar cheist nó faisnéis a bhaineann leis an aighneacht seo a roinnt