Positive news - and needs to be prioritised
Údar: 
Shane O'Brien
Comhairliúchán: 
Part 8 - Grand Canal Greenway Phase 2 Additional Bridges - P82025.03
Dáta a cuireadh isteach: 
27.05.2025 - 20:50

Litir Chumhdaigh

I live near the Grand Canal, and use the existing sections of the Greenway on a regular basis.

The potential for the Grand Canal Greenway is enormous, and the remaining uncompleted sections should be prioritised for completion ASAP.

The Grand Canal Greenway will be a key link from Dublin (a large population & a key tourist hub) to the Barrow Blueway, the River Shannon and other sustainable travel routes, and to other tourist locations.

Tuairimí: 
Should be prioritised
Caibidil: 
Part 8 - Grand Canal Greenway Phase 2 Additional ...

As above, this project should be prioritised and the bridges built as soon as possible.
This is also a good opportunity to implement the required infrastructure for a greenway:

  • Seating
  • Signage
  • Information about the local area
  • Maps
  • Bins
  • Water taps
  • etc.
Eochairfhocail: 
Priority
Infrastructure
Important
Network
Sustainable travel
Príomh-thuairim: 

This project should be prioritised and the bridges built as soon as possible.

Príomh-iarratais: 

Construction of bridges will provide a good opportunity to install Greenway infrastucture at the same time

Main reasons: 

Grand Canal Greenway has taken a long time to get this far, and priority is needed to complete these last remaining sections.