fa-printPriontáil
Baile

Should be prioritised

Uimhir Thagarta Uathúil: 
KCC-C373-1
Stádas: 
Submitted
Aighneacht: 
Positive news - and needs to be prioritised
Údar: 
Shane O'Brien
Comhairliúchán: 
Part 8 - Grand Canal Greenway Phase 2 Additional Bridges - P82025.03
Dáta a cuireadh isteach: 
27.05.2025 - 20:50

Tuairim

Should be prioritised
Caibidil: 
Part 8 - Grand Canal Greenway Phase 2 Additional ...

As above, this project should be prioritised and the bridges built as soon as possible.
This is also a good opportunity to implement the required infrastructure for a greenway:

  • Seating
  • Signage
  • Information about the local area
  • Maps
  • Bins
  • Water taps
  • etc.
Eochairfhocail: 
Priority
Infrastructure
Important
Network
Sustainable travel
Príomh-thuairim: 

This project should be prioritised and the bridges built as soon as possible.

Príomh-iarratais: 

Construction of bridges will provide a good opportunity to install Greenway infrastucture at the same time

Main reasons: 

Grand Canal Greenway has taken a long time to get this far, and priority is needed to complete these last remaining sections.

Documents Attached: 
Níl